好文档 - 专业文书写作范文服务资料分享网站

Excel使用技巧大全(超全)《全》

天下 分享 时间: 加入收藏 我要投稿 点赞

videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \ timetables \o resolve outstanding issues, obviously worked,\ory of the year. The County's departments at all levels must firmly establish the \old and silver\n development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \he war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \oved at the county level, up to five\ctive grasp of pollution control that focus, with the focus on three things: a good job, \he County created. Organization \back\nspection, the County garbage River, black and odorous River is \net\on, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \-stop strategy\oving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \s\al attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \nt from sewage treatment rate, running accuracy, compliance\d up the town's support network construction, is focusing on nanotubes home \on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to %up mud\deepening water of this year's \Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \one policy\es detailed cleaning, dredging plan, planning ahead of time cleaning out mud \ding to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of工作表底部水平滚动条右侧的小块上,鼠标指针便会变成一个双向的光标。把这个小块拖到工作表的中部,你便会发现整个工作表被一分为二,出现了两个数据框,而其中的都是当前工作表内的内容。这样你便可以让一个数据框中显示A列数据,另一个数据框中显示Z

列数据,从而可以进行轻松的比较。

150.

如何消除缩位后的计算误差(微软Office技巧大赛获奖作品)

有时我们输入的数字是小数点后两位数,但是在精度要求上只要一位,缩位后显示没问题,但其计算结果却是有误差的。解决方法是:单击“工具→选项→重新计算”,选中“以显示值为准”(),这样计算结果就没有误差了。 事实上并不是计算上有误差,而是显示设置的四舍五入。采用本技巧提供的方法,可以解决显示中的问题,但同时会改变数值的

精度,在使用前Excel会给你一个警告。

151.

利用选择性粘贴命令完成一些特殊的计算

如果某Excel工作表中有大量数字格式的数据,并且你希望将所有数字取负,请使用选择性粘贴命令,操作方法如下: 在一个空单元格中输入“-1”,选择该单元格,并点击“编辑→复制”命令,选择目标单元格。点击“编辑→选择性粘贴”命令,选中粘贴栏下的数值和运算栏下的乘,点击“确定”,所有数字将与-1相乘。你也可以使用该方法将单

元格中的数值缩小1000或更大倍数。

152.

Web查询

保持Excel工作表总是最新 Web页上经常包含适合在Excel中进行分析的信息,例如,可以在Excel中使用直接从Web页上获取的信息分析股票报价。但如果你需要经常更新信息就必须借助Web页上的最新信息。现在Excel 2002可以用可刷新Web查询简化这个任务来创建新的可刷新Web查询,方法如下: 在浏览器中浏览要查询数据的Web页,把数据复制并粘贴到Excel工作表中。在粘贴的数据下方将出现一个粘贴选项智能标记,单击粘贴选项智能标记右边的箭头,再单击创建可刷新的Web查询,在新建Web查询对话框中,点击你想要查询的数据表前面的黄色箭头,单击导入。 在Excel中可以手动或自动刷新这个数据。手动刷新方法如下:在外部数据工具栏上,单击数据区域属性按钮,在刷新控制下面选中你想要的选项的复选框。 注意:当你从Web站点获取数据时,可能会丢失一些格式或

内容,像脚本、gif图像或单个单元中的数据列表。

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \ction plans\s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation \di\d row\neering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \e to split\a Baolong, Secretary of provincial party Committee stressed that while the \e to split\on time is over three years, but \continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and %uthorised\eatedvideoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \ timetables \o resolve outstanding issues, obviously worked,\ory of the year. The County's departments at all levels must firmly establish the \old and silver\n development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \he war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \oved at the county level, up to five\ctive grasp of pollution control that focus, with the focus on three things: a good job, \he County created. Organization \back\nspection, the County garbage River, black and odorous River is \net\on, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \-stop strategy\oving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \s\ standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, o improve \nt from sewage treatment rate, running accuracy, compliance\d up the town's support network construction, is focusing on nanotubes home \on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to %up mud\deepening water of this year's \Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \one policy\es detailed cleaning, dredging plan, planning ahead of time cleaning out mud \ding to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of

153.

在Excel中进行快速计算

查看一系列单元格的最大值的操作方法: 选择你感兴趣的单元格,你将看到所选单元格的总和显示在状态栏中。状态栏就是工作表窗口下方的水平区域。如果没有出现状态栏,单击视图菜单中的状态栏,鼠标右击状态栏,然后单击最大值,现在你就可以在状态栏中看到最大值了。该方法可以计算选定单元格的平均值、总和、最小值。此外,你还可使用该方法计算包含数字的单元格的数量(选择计数值),或者计算已填充单元格的数量(选

择计数)。

154.

自动筛选前10个

有时你可能想对数值字段使用自动筛选来显示数据清单里的前n个最大值或最小值,解决的方法是使用“前10个”自动筛选。当你在自动筛选的数值字段下拉列表中选择“前10个”选项时,将出现“自动筛选前10个”对话框,这里所谓“前10个”是一个一般术语,并不仅局限于前10个,你可以选择最大或最小和定义任意的数字,比如根据需要选择

8个、12个等。

155.

同时进行多个单元格的运算(微软Office技巧大赛获奖作品)

如果我们现在有多个单元格的数据要和一个数据进行加减乘除运算,那么一个一个运算显然比较麻烦,其实利用“选择性粘贴”功能就可以实现同时运算。下面我们一起来看一个实例。 我们要将C1、C4、C5、D3、E11单元格数据都加上25,那么可以这样做:首先在一个空白的单元格中输入25,选中这个单元格后点击鼠标右键选择“复制”。然后按住Ctrl键依次点击C1、C4、C5、D3、E11单元格,将这些单元格选中。接下来点击鼠标右键选择“选择性粘贴”,在“选择性粘贴”对话框中勾选“运算”框内的“加”选项,点击

“确定”。现在我们可以看到,这些单元格中的数据都同时被加上了25。

156.

让Excel出现错误数据提示

Excel除了可以对单元格或单元格区域设置数据有效性条件并进行检查外,还可以在用户选择单元格或单元格区域时显示帮助性“输入信息”,也可以在用户输入了非法数据时提示“错误警告”。 选取单元格或单元格区域,单击“数据→有效性”命令,单击“输入信息”选项卡,选定“选定单元格时显示输入信息”复选框,输入标题,如“注意”,

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \ction plans\s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation \di\d row\neering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \e to split\a Baolong, Secretary of provincial party Committee stressed that while the \e to split\on time is over three years, but \continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and %uthorised\eatedvideoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \ timetables \o resolve outstanding issues, obviously worked,\ory of the year. The County's departments at all levels must firmly establish the \old and silver\n development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \he war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \oved at the county level, up to five\ctive grasp of pollution control that focus, with the focus on three things: a good job, \he County created. Organization \back\nspection, the County garbage River, black and odorous River is \net\on, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \-stop strategy\oving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \s\al attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \nt from sewage treatment rate, running accuracy, compliance\d up the town's support network construction, is focusing on nanotubes home \on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to %up mud\deepening water of this year's \Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \one policy\es detailed cleaning, dredging plan, planning ahead of time cleaning out mud \ding to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of输入显示信息如“这里应输入负数!”(),单击“确定”按钮。此后,再选定那些单元格或单元格区域时,Excel将自动提示上述信息。 另外,你还可以对设置了有效性条件检查的单元格或单元格区域,再设置“出错警告”信息,方法是:选取单元格或单元格区域,单击“数据→有效性”命令,单击“出错警告”选项卡,选定“输入无效数据时显示出错警告”复选框(),选择警告样式,输入标题如“警告”,输入出错信息如“不能输入正数!”,然后单击“确定”按钮即可。此后,如果你在指定的单元格中输入了正数,Excel

将警告你“不能输入正数!”

157.

用“超级连接”快速跳转到其它文件

用超级链接在各个位置之间跳转十分方便,若你要切换到其它文件,只需用鼠标指向带有下划线的蓝色超级链接文件,然后单击鼠标即可跳转到超级链接所指向的子位置上去,

看完后若要返回,只需单击“Web”工具栏上的“返回”按钮即可。

一、 设置技巧

158.

定制菜单命令

你可以根据自己的要求来定制选项菜单。首先单击“工具→自定义”命令,打开其中的“命令”选项卡(),在左侧的“类别”窗口中选择欲增删的菜单类别。如果是增加菜单命令,你只需在右侧的“命令”格内进行选择,将其拖至对应的菜单项,菜单自动打开并出现一黑线后,将其插入黑线指示的位置,在空白处单击鼠标左键即可。如果是删除菜单命令,只须打开菜单选中需要删除的命令,按下鼠标左键将它拖至图中的“命令”格中即可。也可在该示意图打开的情况下,打开菜单单击右键,选中“删除”命令即可。

159.

设置菜单分隔线

Excel工具栏按钮之间有分隔线,如果你喜欢,也可以在菜单中的命令之间添加分隔线。方法是:按住Alt键后拖动菜单。如果拖动方向为增大菜单间距,则自动在中间添加分

隔线;如果拖动方向为减小菜单间距,则自动去掉中间的分隔线。

160.

备份自定义工具栏

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \ction plans\s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation \di\d row\neering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \e to split\a Baolong, Secretary of provincial party Committee stressed that while the \e to split\on time is over three years, but \continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and %uthorised\eatedvideoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \ timetables \o resolve outstanding issues, obviously worked,\ory of the year. The County's departments at all levels must firmly establish the \old and silver\n development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \he war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \oved at the county level, up to five\ctive grasp of pollution control that focus, with the focus on three things: a good job, \he County created. Organization \back\nspection, the County garbage River, black and odorous River is \net\on, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \-stop strategy\oving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \s\ standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, o improve \nt from sewage treatment rate, running accuracy, compliance\d up the town's support network construction, is focusing on nanotubes home \on. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to %up mud\deepening water of this year's \Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \one policy\es detailed cleaning, dredging plan, planning ahead of time cleaning out mud \ding to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of 在C:\Windows\Application Data\Microsoft\Excel文件夹中有个Excel10.xlb文件,这个文件保存了你的自定义工具栏和其他屏幕位置上每一个可见的工具栏信息。所以,建议你将工具栏设置好后,为Excell0.xlb文件作拷贝,起个不同的名字,以备随时

载入,恢复你的工具栏。

161.

共享自定义工具栏

如果你建立了一个自定义工具栏并希望和其他人一起分享的话,你可以将它“附加”到一个工作簿中。单击“工具→自定义→工具栏”,选择你的自定义工具栏,单击“附加”按钮(),出现“附加工具栏”对话框,单击“复制”按钮,即可将工具栏添加到一个工

作簿中。

162.

使用单文档界面快速切换工作簿

Excel 2002采用了单文档界面,每打开一个工作簿,都会在任务栏中显示出来。因此,你可以通过单击任务栏上的名称来快速切换工作簿,而不必在“窗口”菜单中选择打开的工作簿名称。如果你的Excel 2002没有此项功能,可按以下方法设置:单击“工具→选项”命令,单击“视图”选项卡,选中“任务栏中的窗口”复选框(),单击“确定”按钮即

可。

163.

自定义工具栏按钮

单击“工具→自定义”命令,打开“自定义”对话框使Excel处于自定义模式,这时你可以用鼠标右键单击工具栏上的按钮图标,弹出快捷菜单,利用这个快捷莱单,我们可以完成好多自定义工作。 1.使用“命名”改变工具按钮的名称; 2.使用“复制按钮图像”可以将按钮的图标复制到剪贴板中,然后插入到文本或表格中、或者粘贴到另一个按钮上;

3.使用“编辑按钮图像”来调用按钮编 。

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \ction plans\s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously implementation \di\d row\neering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \e to split\a Baolong, Secretary of provincial party Committee stressed that while the \e to split\on time is over three years, but \continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and %uthorised\eated

Excel使用技巧大全(超全)《全》

videoconference,SecretaryoftheprovincialCommitteeofXiaBaolongstressed:thisyearisthe\timetables\oresolveoutstandingissues,obviouslyworked,\oryoftheyear.TheCounty'sdepartme
推荐度:
点击下载文档文档为doc格式
9xr7t2x9fh7u3cm9b9nu86wqu5roxb0037m
领取福利

微信扫码领取福利

微信扫码分享