8.1施工控制网 ·············· 97
9.施工安全、治安保卫和环境保护 ········· 97
9.2承包人的施工安全责任 ········· 97 9.3治安保卫 ··············· 97 9.4环境保护 ··············· 97
10.进度计划 ·················· 97
10.1合同进度计划 ············ 97 10.2合同进度计划的修订 ········· 98
11.开工和竣工 ················· 98
11.3发包人的工期延误 ·········· 98 11.4异常恶劣的气候条件 ·········11.5承包人的工期延误 ··········11.6工期提前 ··············12.暂停施工 ··················12.1承包人暂停施工的责任 ········12.4暂停施工后的复工 ··········13.工程质量 ··················13.2承包人的质量管理 ··········13.3承包人的质量检查 ··········13.4监理人的质量检查 ··········13.5工程隐蔽部位覆盖前的检查 13.7质量争议 ··············15.变更 ····················15.1变更的范围和内容 ··········15.3变更程序 ··············15.4变更的估价原则 ···········15.5承包人的合理化建议 ·········15.8暂估价 ···············16.价格调整 ··················16.1物价波动引起的价格调整 ·······17.计量与支付 ·················17.1计量 ················17.2预付款 ···············17.3工程进度付款 ············17.4质量保证金 ·············17.5竣工结算 ··············18.竣工验收 ··················18.2竣工验收申请报告 ··········18.3验收 ················18.5施工期运行 ·············18.6试运行 ···············18.7竣工清场 ··············18.8施工队伍的撤离 ···········18.9中间验收 ··············19. 缺陷责任与保修责任 ···········19.7保修责任 ·············· 98 99 99
99
99 99
99
99 100 100 100 100
100
100 100 101 101 101
102
102
102
102 104 105 106 106
106
106 107 107 107 107 107 107 108
108
······20. 保险 ·················· 108
20.1工程保险 ·············· 108 20.4第三者责任险 ············ 108 20.5其他保险 ·············· 108 20.6对各项保险的一般要求 ········ 109
21. 不可抗力 ················· 109
21.1不可抗力的确认 ··········· 109 21.3不可抗力后果及其处理 ········ 109
24. 争议的解决 ················ 109
24.1争议的解决方式 ··········· 109 24.3争议评审 ··············第三节 合同附件格式 ···············附件一:合同协议书 ··············附件二:承包人提供的材料和工程设备一览表 附件三:发包人提供的材料和工程设备一览表 附件四:预付款担保格式 ············附件五:履约担保格式 ·············附件六:支付担保格式 ·············附件七:质量保修书格式 ············附件八:廉政责任书格式 ············第五章 工程量清单 ··················1、工程量清单说明 ·················2、投标报价说明 ··················3、其他说明 ····················3.1词语和定义 ·················3.2工程量差异调整 ···············3.3暂列金额和暂估价 ··············3.4其他补充说明 ················4、工程量清单与计价表 ···············4.1工程量清单封面 ················4.2投标总价表 ··················4.3总说明 ····················4.4工程项目投标报价汇总表 ············4.5单项工程投标报价汇总表 ············4.6单位工程投标报价汇总表 ············4.7分部分项工程量清单与计价表 ··········4.8工程量清单综合单价分析表 ···········4.9措施项目清单与计价表(一) ···········4.10措施项目清单与计价表(二) ··········4.11其他项目清单与计价汇总表 ··········4.11-1暂列金额明细表 ··············4.11-2材料和工程设备暂估单价表 ·········4.11-3专业工程暂估价表 ·············4.11-4计日工表 ·················4.11-5总承包服务费计价表 ············ 109
110
111 113 114 115 116 118 120 122
125 125 125 128 128 129 130 130 131 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146
······4.12规费、税金项目清单与计价表 ········· 147 4.13措施项目清单组价分析表 ··········· 148 4.14费率报价表 ················· 149 4.15主要材料和工程设备选用表 ·········· 150 第六章 图 纸 ····················· 153
1.图纸目录 ···················· 154 2.图 纸 ····················· 155 第七章 技术标准和要求 ················ 159
第一节 一般要求 ·················· 159 1.工程说明 ··················· 159 2.承包范围 ···················3.工期要求 ···················4.质量要求 ···················5.适用规范和标准 ················6.安全文明施工 ·················7.治安保卫 ···················8.地上、地下设施和周边建筑物的临时保护 ·····9.样品和材料代换 ················10.进口材料和工程设备 ·············11.进度报告和进度例会 ·············12.试验和检验 ·················13.计日工 ···················14.计量与支付 ·················15.竣工验收和工程移交 ·············16.其他要求 ··················第二节 特殊技术标准和要求 ·············1.材料和工程设备技术要求 ············2.特殊技术要求 ·················3.新技术、新工艺和新材料 ············4.其他特殊技术标准和要求 ············第三节 适用的国家、行业以及地方规范、标准和规程 ··第八章 投标文件格式 ·················目 录 ·····················一、投标函及投标函附录 ··············(一)投标函 ···················(二)投标函附录 ·················二、法定代表人身份证明 ··············二、授权委托书 ··················三、联合体协议书 ·················四、投标保证金 ··················五、已标价工程量清单 ···············六、施工组织设计 ·················附表一:拟投入本工程的主要施工设备表 ······附表二:拟配备本工程的试验和检测仪器设备表 ··· 160 161 162 162 162 171 172 173 175 175 176 177 178 180 181 182 182 182 183 183 184 188
190 191 191 192 194 195 196 197 198 199 201 202
附表三:劳动力计划表 ·············· 203 附表四:计划开、竣工日期和施工进度网络图 ···· 204 附表五:施工总平面图 ·············· 205 附表六:临时用地表 ··············· 206 附表七:施工组织设计(技术暗标部分)编制及装订要求 207 七、项目管理机构 ················· 208 (一)项目管理机构组成表 ············· 208 (二)主要人员简历表 ··············· 209 八、拟分包计划表 ················· 212 九、资格审查资料 ················· 213 (一)投标人基本情况表 ·············· 213 (二)近年财务状况表 ··············· 214 (三)近年完成的类似项目情况表 ·········· 215 (四)正在施工的和新承接的项目情况表 ······· 216 (五)近年发生的诉讼和仲裁情况 ·········· 217
(六)企业其他信誉情况表(年份要求同诉讼及仲裁情况年份要求) 218 (七)主要项目管理人员简历表 ··········· 219 十、其他材料 ··················· 220
第一卷
第一章 招标公告(未进行资格预审)
(项目名称) 标段施工招标公告
1.招标条件
本招标项目 (项目名称)已由 (项目审批、核准或备案机关名称)以 (批文名称及编号)批准建设,招标人(项目业主)为 ,建设资金来自 (资金来源),项目出资比例为 。项目已具备招标条件,现对该项目的施工进行公开招标。
2.项目概况与招标范围
(说明本招标项目的建设地点、规模、合同估算价、计划工期、招标范围、标段划分(如果有)等)。
3.投标人资格要求
3.1本次招标要求投标人须具备 资质, (类似项目描述)业绩,并在人员、设备、资金等方面具有相应的施工能力,其中,投标人拟派项目经理须具备 专业 级注册建造师执业资格,具备有效的安全生产考核合格证书,且未担任其他在施建设工程项目的项目经理。
3.2本次招标 (接受或不接受)联合体投标。联合体投标的,应满足下列要求: 。
3.3各投标人均可就本招标项目上述标段中的 (具体数量)个标段投标,但最多允许中标 (具体数量)个标段(适用于分标段的招标项目)。
4.投标报名
凡有意参加投标者,请于 年 月 日至 年 月 日(法定公休日、法定节假日除外),每日上午 时至 时,下午 时至 时(北京时间,下同),在 (有形建筑市场/交易中心名称及地址)报名。
5.招标文件的获取