10kV电缆站线工程
专业监理实施细则
中天工程监理
10千伏电缆站工程项目监理部
2014年6月
批准:审核:编写: 月 月 月
年 日
年 日
年 日
目 次
1
、
工
程
概
况
及
特
点··································································································· 1 2
、
编
制
依
据 ···········································································································3
·、
·
监
·
理
2 目
标 ··········································································································4
、
监
理
工
作
流
程
及
重
点
3 工
作········································································5
、
监
·理
工
作
·容
、
措·
施
及
3 方
法··································
·····································6
、
·
质
·量
·通
病
·
防
1治
9 措
施········································································7
·
、·
·
质
·
·量
·
·控
·
·制
3
9 标
准·························································································39
1 工程概况
1.1工程概况
本工程为电缆站线配电线路改造工程,其中10kV电缆站线原路径10#—13#改造为9#—12#—16#,新路径单回路架设导线选用JKLYJ-10-185mm2架空绝缘线,线路长180米;16#—15#和18#—23#杆位不变,将导线更换为JKLYJ-10-70mm2架空绝缘线,路径长度为241米。
东环路西侧10kV电缆站线9#杆往南延伸和公安局大楼门前16#接火,新电杆10#、11#、12#在道路西侧绿化带,原线路10#—13#导线拆除,11#、12#、13#电杆保留,新路径9#—16#电杆采用Φ190*15m。16#—15#和18#—23#电杆不换,15#—18#电缆线路保留。10#—2#、11#—1#导线采用JKLYJ-10-70mm2,电杆不换。
工程注意事项:本工程外漏可导电部分加装绝缘罩,主干线、分支线加装断路器的相邻杆塔加装验电接地环。
1.2 本工程参建单位
建设单位:新疆天富热电股份 勘察设计:东大能源工程 监理单位:中天工程监理 施工单位: 2 编制依据
? 《中华人民国建筑法》(中华人民国主席令第91号) ? 《中华人民国合同法》1999年颁布
? 《中华人民国招投标法》(中华人民国主席令第21号) ? 《中华人民国电力法》(中华人民国主席令第60号) ? 《中华人民国环境保护法》(中华人民国主席令第23号) ? 《中华人民国环境保护条例》1998颁布
? 《建设项目环境保护管理条例》1998年国务院令253 号 ? 《水土保持法实施条例》1993年国务院令120号 ? 《中华人民全生产法》(中华人民国主席令第70号)
? 《建设工程安全生产管理条例》(中华人民国国务院令第393号) ? 《生产安全事故报告和调查处理条例》(中华人民国国务院令第493号) ? 《建筑工程质量管理条例》(中华人民国国务院令第279号) ? 《建设工程监理规》(GB 50319-2012) ? 《电力工程建设监理规》(DL/T5434-2009)
? 《国家重点工程建设项目文件归档要求与档案整理规》DA/T28-2002 ? 《国家电网公司基建质量管理规定》(国家电网基建[2011]1759号)