¹Ü¾®½µË®Ê©¹¤·½°¸
The construction scheme of tube well dewatering
-----¼íÆÒÕ¯°²´ï¶¼»á¹ã³¡ÏîÄ¿
------VCLP PROJECT CAMBODIA
ÎÄ°¸´óÈ«±àÖƵ¥Î»£ºSinoma HanDan Construction Co.,Ltd
±à ÖÆ£º
compiled:__________________
Éó Åú£º
Verified: __________________
Åú ×¼£º
Approved: __________________
ÈÕ ÆÚ£º
Date : __________________
ʵÓÃÎĵµ
°²´ï¹ã³¡»ù¿Ó½µË®Ê©¹¤·½°¸
Construction Scheme for Foundation Pit Drawdown
of VATTANAC Park
Ò»¡¢½µË®Éè¼Æ·½°¸ I. Drawdown design scheme
1.1¡¢Éè¼Æ²ÎÊý 1.1. Design data
±¾¹¤³Ì½µË®¾®²ÉÓÃÖ±¾¶300mm²¨ÎƹÜÂ˹ܣ¬¹Ü¾®¹²20¸ù¾®Éî22Ã×£¬¾®¿ÚÍâ¶500mm¡£
300mm corrugated filter pipe is adopted as the drawdown well and there are total 20 wells of 22m deep each. The wellhead exposes by 500mm.
1.2¡¢½µË®¾®Æ½Ãæ²¼Öà 1.2. Layout of drawdown well
½µË®¾®²¼ÖÃÏê¼û½µË®¹Ü¾®Æ½Ãæ²¼ÖÃͼ¡£
The arrangement of drawdown well is shown on the layout of drawdown well.
ÎÄ°¸´óÈ«
ʵÓÃÎĵµ
¶þ¡¢Ê©¹¤×¼±¸
II. Construction preparation
2.1¡¢²âÁ¿·ÅÏß
2.1. Surveying and setting out
²âÁ¿·ÅÏßÒÀ¾ÝÏÖ³¡²âÁ¿¿ØÖƵ㣬±ê¸ß²ÉÓÃË®×¼ÒÇ£¬²¢¸ù¾Ý¾®µã²¼ÖÃͼ²ÉÓÃÈ«Õ¾ÒÇ·ÅÏ߶¨Î»¡£·ÅÏß¾¸´ºËºó±¨¹ÜÀí¹«Ë¾È·ÈÏ·½¿É½øÐÐÊ©¹¤¡£
The surveying and setting out shall be based on the field survey control points and optical level shall be used for measuring the elevation. In addition, the total station instrument shall be used for the setting out and positioning according to the layout of well points. Setting out shall be performed after re-recheck and being reported to the management company for confirmation. 2.2¡¢Ê©¹¤Óõ硢ÓÃË®ÅäÖÃ
2.2 Electricity and water for construction
1¡¢Ê©¹¤ÓõçÖ±½Ó´ÓÅäµç·¿½ÓÈ룬50kVAÄÜÍêÈ«Âú×㽵ˮÓõ縺ºÉ¡£
1. The electricity for construction shall be directly connected from the switchgear room, and 50kVA can fully meet the drawdown load requirements.
2¡¢ÒÀ¾ÝÓÃË®É豸ºÍÊ©¹¤¾Ñ飬ÐèÓÃË®Á¿10m3/hÖ±¾¶50mm¹Ü£¬
ÎÄ°¸´óÈ«
¹Ü¾®½µË®Ê©¹¤·½°¸Éè¼Æ