生产验证PP Production Proveout 工装设备试运行TTO Tool Try-Out 整车投产(J1) Job 1
故障模式影响分析设计DFMEA Design Failure Mode Effects Analysis 设计验证计划DVP Design Verification Plan
设计验证计划和结果DVP&R Design Verification Plan & Report 故障模式影响分析FMEA Failure Mode Effects Analysis 福特产品开发系统FPDS Ford Product Development System 红-绿-黄GYR Green-Yellow-Red
物料要求到厂日MRD Material Required Date 可以开模OTT OK-TO-TOOL 工装启动TKO Tooling-Kick-Off
设备最初制造厂OEM original Equipment Manufacturer 面对面会议FtF/F2F Face To Face 产品验证PV Production Validation 完全工装样件OTS Off-Tooling-Sample 质量运作体系QOS Quality Operating System
-1694916949 技术规范TS-16949 Technical Specification – 先期产品质量计划APQP Advanced Product Quality Planning 进厂日IPD In Plant Date
PPM Parts per Million (applied to defective Supplier parts) 零件的百万分比率(适用 于供
应商不合格零件).
生产件批准程序PPAP Production Part Approval Process
Pre-PV Pre -Production Validation 产品预先验证
第一次试生产1PP- First Phase of Production Prove-Out
(专长导向)Competence)、)、Competition(竞争导向顾客导向3C Customer( 信息反馈
零配件, Service, Survey4S Sale, Sparepart 整理,整顿,清理,清洁,素养5S
8D- 8 Discipline Anti-lock Braking SystemABS 美国汽车联合会 AIAG
ANPQP Alliance New Product Quality Procedure 分配Apportionment Advanced Product Quality Plan APQP 后窗玻璃Backlite Windshield 样件资料Benchmark Data
有血丝的, bloodshot adj.充血的 Bavarian Motor WorksBMW 认证采购经理人制度 Certified Purchasing manger C.P.M 确认样车制造CB- Confirmation Build 设计变更冻结CC- Change CutOff
CC\\SC- critical/significant characteristic Concern & Countermeasure RequestCCR Cross Company TeamCCT 特性矩阵图 Characteristics Matrix
(T/T in advance)预付货款 COD Cash on Delivery 货到付现 第一次确认样车CP1-
Confirmation Prototype 1st
第二次确认样车CP2- Confirmation Prototype 2nd Cpk=Zmin/3 过程能力指数Cpk Complementary Parts orderCPO 精致工艺Craftsmanship 跨功能小组Cross-functional teams Car-Based Ultility VehicleCUV
8D:信息收集;D1 小组;8DD2:建立 :制定临时的围堵行动措施,避免不良品流出;D3 :
定义和证实根本原因,避免再发;D4 :根据基本原因制定永久措施;D5 :执行和确认永久措施;D6 :预防再发,实施永久措施;D7 :认可团队和个人的贡献。D8 Design Change ControlDCC
面向装配的设计 DFA- Design For Assembly 试验设计 Design Of ExaminationDOE DQES Delivery Quality Evaluation System Direct To LineDTL
设计验证计划报告DVP&R Design Validate Plan&Report 电子数据交换 electronic data
interchange EDI
整个, , 完整的entire adj. 全部的 Enterprise Resource Planning ERP 工程规格ES Engineering Specification 供应商先期参与ESI Early Supplier
Involvement
Ex-Work(工厂交货)、FOB(船上交货)、FAS(船边交货)或CIF(运保费在内交 货) 用户市场实际体验与评估FEU- Field Evaluation Units
一档first gear
流程图 Flow Chart
Failure Mode and Effects Analysis FMEA 四轮驱动four-wheel drive
福特可靠性指导FRG- Ford Reliability Guideline 前挡风玻璃 Front Windshield 钢化玻璃 Tempered glass 前轮驱动front-wheel drive
全服务供应商FSS- Full service supplier Fault Tree AnalysisFTA
标准公差GD&T- Geometric Dimensioning & Tolerancing 量具的重复性和再现性 Guage Repeatability&reproducibilityGR&R 极度忧伤的grief-stricken adj. 大雨heavy rain
疾风high wind n. 工装集成调试与验证HTFB- Hard Tooling Functional Build Individual Parts orderIPO
Initial Sample Inspection ReportISIR Just In TimeJIT
KD- knocked down/ Semi Knock Down(SKD) /Completely Knock Down(CKD)
Kick-offKO
夹层玻璃 Laminated glass 精益生产 LP-Lean Production Launch Readiness LR
Launch SupportLS
Local Vendor Packaging MethodLVPM 多用途汽车 Multi-PurposeVehicle MPV Material Required DateMRD
Maintenance,Repair,and OperationMRO 照图加工供应商MTP- Make to print supplier
N/A- Not Applicable Non-Conforming Delivery ReportNCDR Non-Conforming Material Action ReportNCMAR 保密协定 Non Disclosure Agreement NDA Nissan Design SpecificationNDS Nissan Motor Ltd NML
振动及粗糙性,NVH- System Noise, Vibration & Harshness 系统噪音 过去的,从前的
onetime adj. OSM- Outside of Material 非处方药,可在柜台上卖的药OTC Over The Counter
Program ApprovalPA 托盘pallet n.
乘用车 Passenger Vehicle
产品属性小组PAT- Program Attributes Team Product Design Letter PDL Proportions&Hardpoints PH
能力指数百分比PIPC- Percentage of Indexes with Process Capability
检测点满意工差百分比PIST- Percentage of Inspection points Satisfying Tolerance