民机项目风险量化方法及应用的研究
徐凯
【期刊名称】《民用飞机设计与研究》 【年(卷),期】2015(000)004
【摘要】Civil aircraft projects include application of a large number of new technologies and integration of many complex systems. The uncertainty on project schedule targets, cost targets and performance targets is increased. In many aspects, the risk factors have been increasing. In order to ensure the research process of civil aircraft pro-grams smoothly and reduce the projects risk level, an advanced risk management system must be established. For the risk quantification problem on risk management system of civil aircraft project, this article explores the technical content of risk quantitative measures, combining the characteristics of civil aircraft projects. The risk quantification method of Fuzzy Analytic Hierarchy Process was introduced and verified by risk instance of civil aircraft project.%民机项目中大量新技术的应用和众多复杂系统的集成,增加了项目进度、费用和性能的不确定性,在众多环节中风险因子要素层出不穷. 为了保障民机项目过程的顺利进行,降低项目的风险水平,必须建立先进的风险管理体系. 针对民机项目风险管理体系中的风险量化难题,深入挖掘风险量化手段本身的技术内涵,结合民机项目的特点,引入了模糊层次分析法的风险量化方法,并通过民机项目风险实例进行验证. 【总页数】6页(97-102)
【关键词】风险量化;模糊;层次分析法;权重;隶属度 【作者】徐凯
【作者单位】上海飞机设计研究院,上海201210 【正文语种】中文 【中图分类】F426.5 【文献来源】
https://www.zhangqiaokeyan.com/academic-journal-cn_civil-aircraft-design-research_thesis/0201220310894.html 【相关文献】
1.BOT项目风险量化方法与应用 [J], 戴大双; 于英慧; 韩明杰 2.层次分析法在承包工程项目风险评价中的应用研究 [J], 贺剑平 3.层次分析法在工程项目风险评价中的应用研究 [J], 李海凌; 宋吉荣 4.项目风险识别量化方法研究 [C], 刘仁辉; 安实 5.海洋石油施工项目风险后果量化方法探析 [J], 徐浩伦
以上内容为文献基本信息,获取文献全文请下载