TITLE: Processing Of System Planning 标题:计划流程 DOC No. FBM-Planning REV:B Page 26 of 37 Session number is cprpd4200m000.选择菜单。 Confidential & Proprietary Information of xxx

TITLE: Processing Of System Planning 标题:计划流程 DOC No. FBM-Planning REV:B Page 27 of 37 Use the simulation scenario Fill in the original scenario Fill in the target scenario Confidential & Proprietary Information of xxx

TITLE: Processing Of System Planning 标题:计划流程 DOC No. FBM-Planning REV:B Page 28 of 37 5.3.3.1 If increase the forecast order, should check inventory for shortages, use query of SHARK0001 for plan PO and SHAEP001 for signal. 如果预测定单是增加的,应该检查短缺物料库存状况,可以使用SHARK0001来检查计划采购订单,以及使 用SHAEP001来查询相关的信息。 5.3.3.1.1 If there are no any shortage materials, inform PM for the status and PM will revert to customer on feasibility plan. 如果模拟运行后显示没有任何短缺物料,将此情况通知项目经理,项目经理将依据可行性计划回复给客户。 5.3.3.1.2 If there are any shortage materials, ask buyer to check with supplier on the expected delivery of demand, inform PM for the status and PM will revert to customer on feasibility plan. 如果模拟运行后显示有短缺物料,要求采购员与供应商确认是否可以满足期望交货需求,将情况通知项目经 理,项目经理将依据可行性计划回复给客户。 5.3.3.2 If decrease the forecast order, need to generate cost excess inventory report to check if there are any excess materials. 如果预测定单是减少的,应该运行过剩库存报告来检查是否有过剩物料。 5.3.3.2.1 If there are no any excess inventory materials, inform PM for that and PM will revert to customer on feasibility plan. 如果没有任何过剩物料,通知项目经理此情况,项目经理将回复给客户。 5.3.3.2.2 If there are any excess inventory materials, notify PM of excess materials and PM will revert to customer on feasibility plan. 如果有过剩物料,通知项目经理,项目经理将恢复给客户。 5.4 End Of Life Process终止生产流程 5.4.1 PM get information from customer and inform planner for EOL items. 项目经理从客户处得到终止生产的信息,并通知计划员将终止生产的物料。 5.4.2 Planner will generate cost excess inventory report according to current demand. Session number is gdbdg401m00g. 计划员将根据现有的需求状况运行过剩库存报告。菜单号为gdbdg401m00g。 Confidential & Proprietary Information of xxx

TITLE: Processing Of System Planning 标题:计划流程 DOC No. FBM-Planning REV:B Page 29 of 37 Actual Scenario where the EP is running Buyer code, Item group and item type choose Date range Options must be choose These two options not to be choose Confidential & Proprietary Information of xxx 5.4.2.1 Scenario (Plan Code):Input for selection criteria. Only data that belong to the chosen selected Scenario will be

TITLE: Processing Of System Planning 标题:计划流程 DOC No. FBM-Planning REV:B Page 30 of 37 printed. 环境:选择输入需要运行的环境。 5.4.2.2 Plan Level: Input for selection criteria. Only Plan Level within this range is printed. 5.4.2.2 计划标准:输入选择标准。计划标准仅在可打印的范围之内。 5.4.2.3 Buyer (from / to): Input for printing criteria. Only Items with Buyer within this range is printed. 采购代码:输入需要运行并要得到信息的采购员代码。 5.4.2.4 Item Group (from / to): Input for printing criteria. Only Item Groups within this range are printed. 材料项目组:输入需要运行并要得到信息的材料项目组。 5.4.2.5 Item Type (from / to): Input for printing criteria. Only Item Type within this range is printed. 材料形式:输入需要运行并要得到信息的材料形式,采购件或制造件等。 5.4.2.6 Date (from/to): Input for selection criteria. Only Periods with the Date within this range is printed for the current date until the Finish Date of Scenario. 日期:输入需要运行并要得到信息的日期范围。 5.4.2.7 Item Code (from / to): Input for printing criteria. Only Item Code within this range is printed. 材料料号:输入需要运行并要得到信息的材料料号。 5.4.2.8 Check Production/Purchase Planning: Input for selection criteria. It does not aggregate the quantity that is into the Production or Purchase Planning. 检查生产或采购计划:输入选择标准,是否计算已经在生产或采购计划中的数量。 5.4.2.9 Exclude SIC Items: Input for selection criteria. It excludes SIC Items at the moment the report selects the data. 不包含SIM材料:输入选择标准,将把SIC材料排除在报告外。 5.4.2.10 Exclude Warehouses without Nettable: Input for selection criteria. It excludes the quantities of items that have warehouses with nettable field equal to “No” at the moment the report selects the data. 不包括不可用的库存数据:输入选择标准,将不包括不可用库存的数据。 5.4.2.11 Print only Planned Items Input for selection criteria: It excludes the item code that is not found into the Enterprise Planning module. 仅打印选择标准中的计划了的材料:将不包括没有在企业计划模块中没有找到的材料。 5.4.2.12 Exclude Items without On Order and Stock quantities: Input for selection criteria. It excludes the Items that have not value into the “On Order” and “On Hand (Stock)” fields. 不包括在途或库存数量:输入选择标准,将不包括在在途和库存中没有数量的材料。 5.4.2.13 Processed lines: Display information. It just shows the Total of Items read and printed into the session. 处理状况:显示系统已经或正在处理的信息。 5.4.3 Basing on the EOL information, planner should check if any open WO left. Double click the “whinp1500m000” session to open session Planned Inventory Transactions by Item. Click “New” button to find the item. 依据EOL的信息,计划员应该检查是否留有任何未完成的生产订单。通过菜单whinp1500m000点击进入 Planned Inventory Transactions by Item,点击按钮“NEW”来查找料号。 Confidential & Proprietary Information of xxx

FBM-Planning Processing Of System Planning Rev B

TITLE:ProcessingOfSystemPlanning标题:计划流程DOCNo.FBM-PlanningREV:BPage26of37Sessionnumberiscprpd4200m000.选择菜单。Confidential&ProprietaryInforma
推荐度:
点击下载文档文档为doc格式
8jzs28ue824g4gh0kzl91od1e2lms500xvp
领取福利

微信扫码领取福利

微信扫码分享