土方工程量计量表
施工单位山东水利工程总公司监理单位驻马店鑫桥工程建设监理有限公司地点序号12345678910111213141516总计L14+554.527-L15+254.527桩号L14+554.5270L14+606.8800L14+650.7270L14+700.4400L14+749.5900L14+800.9300L14+848.1170L14+899.4670L14+949.0490L14+999.3310L15+050.7270L15+099.7300L15+149.9080L15+199.7950L15+227.2510L15+254.5270断面积(m2)日期2013.5.1名称断面长度(m)52.353043.847049.713049.150051.340047.187051.350049.582050.282051.396049.003050.178049.887027.456027.276027.2760土方开挖体积(m3)2702.24202403.18172335.50432158.56232266.63282138.50542395.16682365.68862429.21642478.52582338.09242191.69731894.6609847.6354689.231831634.54平均断面积(m2)51.615843.631759.599954.808450.016846.979843.942743.917943.89344.149544.405945.319846.233746.644047.054247.712748.371148.311948.252648.224148.195647.713347.230943.678540.12637.979135.832130.872525.912925.268824.6247备注:L14+554.527-L15+254.527段(共计7个单元)土方开挖工程总量为:31634.54。技术负责人:
监理工程师:
监管单位:
3.5.18方开挖备注34.54立方米0
计量资料