马来西亚沐若 (含生态电站无水调试 方案
2014-Feb. R.3
目录 Catalog
1概述 GENERAL INTRODUCTION (1 1.1引言 F OREWORD (1
1.2电站结构简介 I NTRODUCTION OF S TATION S TRUCTURE (1 1.3水轮机基本参数 B ASIC P ARAMETERS OF T URBINE (1
1.4主要技术数据 B ASIC P ARAMETERS OF H YDRO G ENERATOR (1 1.5调试试验的目的 P URPOSE (2
20.415KV 厂用电系统无水调试 DRY COMMISSIONING OF 0.415KV STATION SERVICE SYSTEM (3
2.1试验目的及内容 P URPOSE AND C ONTENT (3 2.2试验条件 P RE-CONDITIONS (3 2.3试验步骤 T EST S TEPS (4
2.3.1 厂用电、自用电 0.415KV 无水调试 Dry commissioning of 0.415KV station service and
auxiliary power supply (4
2.3.2 柴油发电机组调试 Commissioning of diesel generator (5
3直流系统无水调试方案 DRY COMMISSIONING PROCEDURE OF DC SYSTEM (7
3.1试验目的及内容 P URPOSE AND C ONTENT (7 3.2试验条件 P RE-CONDITIONS (7 3.3试验步骤 T EST S TEPS (7
411KV 厂用电系统无水调试 DRY COMMISSIONING OF 11KV STATION SERVICE (9
4.1试验目的及内容 P URPOSE AND C ONTENT (9 4.2试验条件 P RE-CONDITIONS (9 4.3试验步骤 T EST S TEPS (9
5压缩空气系统无水调试 DRY COMMISSIONING OF COMPRESSED AIR SYSTEM (12
5.1试验目的及内容 P URPOSE AND C ONTENT (12 5.2试验条件 P RE-CONDITIONS (12 5.3试验步骤 T EST S TEPS (12 5.4试验记录表 T EST FORM (15 6 透平油及绝缘油系统调试 (16
6.1试验目的及内容 T EST PURPOSE AND CONTENT (16 6.2试验条件 T EST CONDITION (16
6.3试验步骤 T EST STEP (17
7 检修、渗漏、技术供水系统无水调试 (19
DRY TEST OF MAINTENANCE, LEAKAGE, TECHNICAL WATER SUPPLY SYSTEM ............................................................................................................... 错..误 未定义书签。
7.1试验目的及内容 P URPOSE AND CONTENT OF TEST (19 7.2试验条件 T EST CONDITION (19 7.3试验步骤 T EST STEP (20
7.3.1 渗漏排水系统无水调试 Dry test of leakage drainage system (20 7.3.2 技术供水系统调试 Technical water supply system commissioning (21 8调速器系统无水调试 DRY COMMISSIONING OF GOVERNING SYSTEM.. 25 8.1试验目的及内容 P URPOSE AND C ONTENT (25
8.2试验条件 P RE-CONDITIONS (25 8.3试验步骤 T EST S TEPS (26
8.3.1 电气控制部分检查 Inspection of electrical controlling section (26 8.3.2 液压部分调试 Commissioning of hydraulic section (27 8.3.3 调速器调试 Commissioning of governor (29
8.3.4 与监控联合调试 Joint commissioning with monitoring and controlling (32 9 机组辅助系统无水调试 (67
DRY COMMISSIONING OF UNIT AUXILIARY SYSTEMS