灌注桩(水下)混凝土灌注记录Bored Pile (Underwater) Concreting Record
工程部位project section:工程地点及桩号project location and pile point桩基pile base K______ +______ —K______+______桩设计直径mdesigned pilediameter设计桩顶标高 mdesigned piletop level实灌混凝土数量m3actual concretequantity设计桩底标高designed pilebottem level灌注完毕桩顶标高mpile top levelafter pouring沉渣厚度mmslummagethickness导管长度mconduct lengthconstruction timepile foundation no. 桩基编号:实际桩底标高mactual pilebottom level砼设计强度designedconcretestrength坍落度mmslump 施工时间:设计桩长mdesigned pile length护筒标高mpile casing level计算混凝土方量m3calculated concretequantity导管节数conduct jointnumber时间dateC30水下 below C30导管底口长度(m)混凝土面深度(m)conduct bottomconcrete depthopening length导管拆除数量removed conduct quantity节数长度length(m)joint number导管埋深conduct barialdepth(m)车数tanknumber砼数量砼累计数量concrete quantitytotal concretenumber(m3)(m3)备注remark记录人:recorded by 日期:date监理工程师:
consulting engineer日期:date