好文档 - 专业文书写作范文服务资料分享网站

Preliminary study on the exploitation plan of the mega hydropower base in the lower reache

天下 分享 时间: 加入收藏 我要投稿 点赞

Preliminary study on the exploitation plan of the mega hydropower base in the lower reaches of

Congo River

Chuanyu Deng; Fulong Song; Zhengxi Chen

【期刊名称】《全球能源互联网:英文版》 【年(卷),期】2020(003)001

【摘要】There have been few studies on the hydropower exploitation plan for sections beyond the Inga hydropower project(HPP)in the lower reaches of the Congo River.Based on topographic and hydrological data of the basin,the exploitation plan for the lower reaches of the Congo River is herein studied.The preliminary proposal involves exploitation using three-cascade hydropower stations.The Grand Inga HPP is the core of the mega hydropower base.The full supply level(FSL)of the reservoir,installed capacity,and regulation performance of the Grand Inga HPP are studied in detail.The main advantages and disadvantages of the high and low dam schemes of the Grand Inga Hydropower Project are compared,in addition to their effects on the overall development of the hydropower base.Moreover,the installed capacity is optimized based on the load characteristics.Based on simulation of cascade hydropower operation and comprehensive analysis,the project scale and implementation sequence is proposed.The influence of hydropower on socio-economic development,energy supply,and

Preliminary study on the exploitation plan of the mega hydropower base in the lower reache

PreliminarystudyontheexploitationplanofthemegahydropowerbaseinthelowerreachesofCongoRiverChuanyuDeng;FulongSong;ZhengxiChen【期刊名称】《全球能源互联网:英文版》【年
推荐度:
点击下载文档文档为doc格式
6czga7fdoi0wacw0f2p46m3qp9xkpa00ymz
领取福利

微信扫码领取福利

微信扫码分享