华烨煤矿职工防治水安全培训和教育计划
防治水安全培训和教育计划 说明:
1、每天上课时间:上午 8:30分—11:30分 下午:14:30分—18:00分
2、上课地点:矿安培办教室~上早班的职工参加下午培训~上中班的职工参加上午培训~上夜班的职工根据工作需要可参加上午或下午培训~上、下午培训内容相同。
3、参加培训的职工要严格遵守培训管理制度~非特殊情况不准请假~迟到、早退或班中脱岗~不论何种原因学习课时少于总课时三分之一者~一律取消培训资格。
4、参加培训的职工考试不及格者必须参加补考~经补考仍不及格者~不得从事井下工作。
为响应上级精神贯彻国家煤炭安全监察局加强和规范安全生产培训工作的要求~为了加强煤矿防治水工作~预防和减少水害事故~保障煤矿安全生产~煤矿企业应当对职工进行防治水知识的教育和抵御水灾的能力~现将培训计划如下:
主讲:严国芳
二月一日:矿井水害及其预防 第一节:矿井水源及常见矿井水害 第二节:煤矿水害事故的特点及发生原因 第三节:矿井水害事故的防治原则和措施
digging; has dual functions of retaining, watertight; typically more economical construction without vibration, noise, less pollution,
squeezing slightly, so construction in the downtown area even more advantages. Disadvantages of cement-soil retaining wall: the first is the relatively large displacement, especially in the pit length is large, this may be done between the piers, arches and other measures to limit the displacement is too large, followed by thick, only used in position and the surrounding environment allowing the red line, and in the construction of cement-soil mixing piles to avoid affecting the surrounding environment. 2.1.2 soil-nail wall is a type of slope stability of soil nailing wall support, its role and passive retaining walls are different, it is voluntarily fixing effect, increase the stability of slopes, excavation of Foundation pit slope stability. Soil-nail wall is better soil areas, applied along the northern part of North China and East China, also in southern China, and some has been used to hang 10m deep Foundation pit, stability, construction is simple and short, good, good economy, better soil areas should actively promote. Used soil nail wall of General requirements, ? soil nail wall can applies Yu plastic, not plastic or hard of viscous soil; II in has groundwater of soil in the, soil nail support nursing should in full drop drainage of premise Xia used; ? soil nail wall easy caused soil body displacement, used soil nail wall support nursing should carefully consider, wall body deformation on around environment of effect. 2.1.3 row of piles during excavation, not sloping or due to the limited space and cannot stir pile, depth at around 6 to 10m when you can row pile retaining.
第四节:矿井水害事故的防治方法 第五节:水害事故隐患的识别与治理 学习要点:1、掌握矿井水的来源 2、掌握常见矿井水害 3、掌握探放水设计知识 二月二日:井下探放水技术工艺: 第一节:井下探放水的相关规定 第二节:探放水设计 第三节:探放各类水源的方法 第四节:井下探放水设备、仪器与仪表
学习要点:1、掌握矿井水中各类水源的探放方法 2、掌握井下探放水设备、仪器与仪表的知识 二月三日:实际操作技能 (一)、探放水工安全操作规范 第一节:探放水工安全生产职责 第二节:探放水工安全操作标准内容 第三节:井下钻探工安全技术操作规程 第四节:探放水作业安全注意事项 学习要点:1、掌握探放水工安全生产职责 2、掌握探放水工安全操作规程 3、掌握探放水安全操作标准及内容
二月四日:探放水工常见违章行为及警示案例
digging; has dual functions of retaining, watertight; typically more economical construction without vibration, noise, less pollution,
squeezing slightly, so construction in the downtown area even more advantages. Disadvantages of cement-soil retaining wall: the first is the relatively large displacement, especially in the pit length is large, this may be done between the piers, arches and other measures to limit the displacement is too large, followed by thick, only used in position and the surrounding environment allowing the red line, and in the construction of cement-soil mixing piles to avoid affecting the surrounding environment. 2.1.2 soil-nail wall is a type of slope stability of soil nailing wall support, its role and passive retaining walls are different, it is voluntarily fixing effect, increase the stability of slopes, excavation of Foundation pit slope stability. Soil-nail wall is better soil areas, applied along the northern part of North China and East China, also in southern China, and some has been used to hang 10m deep Foundation pit, stability, construction is simple and short, good, good economy, better soil areas should actively promote. Used soil nail wall of General requirements, ? soil nail wall can applies Yu plastic, not plastic or hard of viscous soil; II in has groundwater of soil in the, soil nail support nursing should in full drop drainage of premise Xia used; ? soil nail wall easy caused soil body displacement, used soil nail wall support nursing should carefully consider, wall body deformation on around environment of effect. 2.1.3 row of piles during excavation, not sloping or due to the limited space and cannot stir pile, depth at around 6 to 10m when you can row pile retaining.
第一节:“三违”的含义及其危害 第二节:煤矿职工常违章行为
第三节:探放水工常见违章行为及警示案例 学习要点:1、了解“三违”的含义和危害 2、了解煤矿职工常见的违章行为 3、熟悉探放水工常见的违章行为 二月四日:复习、考试 探水科
二O一二年一月三十日
digging; has dual functions of retaining, watertight; typically more economical construction without vibration, noise, less pollution, squeezing slightly, so construction in the downtown area even more advantages. Disadvantages of cement-soil retaining wall: the first is the relatively large displacement, especially in the pit length is large, this may be done between the piers, arches and other measures to limit the displacement is too large, followed by thick, only used in position and the surrounding environment allowing the red line, and in the construction of cement-soil mixing piles to avoid affecting the surrounding environment. 2.1.2 soil-nail wall is a type of slope stability of soil nailing wall support, its role and passive retaining walls are different, it is voluntarily fixing effect, increase the stability of slopes, excavation of Foundation pit slope stability. Soil-nail wall is better soil areas, applied along the northern part of North China and East China, also in southern China, and some has been used to