桩板式路基专项工程质量检验标准
Standard for Quality Inspection of Pile Board Roadbed
Specific Construction Project
DB ××/T ×××—20××
目录
前言 ················································································································ III 1 范围 ·························································································································· 1 2 规范性引用文件 ·········································································································· 1 3 术语和定义················································································································· 1 3.1 桩板路基 PILE BOARD ROADBED ·················································································· 1 3.2 关键项目 DOMINANT ITEM ························································································· 1 3.3 一般项目 GENERAL ITEM ··························································································· 1 4 基本规定 ···················································································································· 1 4.1 一般规定 ··············································································································· 1 4.2 工程质量检验 ········································································································· 2 4.3 工程质量评定 ········································································································· 3 5 管桩 ·························································································································· 4 5.1 管桩预制 ··············································································································· 4 5.1.1 基本要求 ········································································································· 4 5.1.2 实测项目 ········································································································· 4 5.1.3 外观鉴定 ········································································································· 5 5.2 管桩安装(锤入法) ································································································ 5 5.2.1 基本要求 ········································································································· 5 5.2.2 实测项目 ········································································································· 5 5.2.3 外观鉴定 ········································································································· 6 5.3 管桩安装(植入法) ································································································ 6 5.3.1 基本要求 ········································································································· 6 5.3.2 实测项目 ········································································································· 6 5.3.3 外观鉴定 ········································································································· 6 5.4 接桩与截桩 ············································································································ 6 5.4.3 外观鉴定 ········································································································· 7 5.5 连接件安装 ············································································································ 7 5.5.1 基本要求 ········································································································· 7 5.5.2 实测项目 ········································································································· 7 5.5.3 外观鉴定 ········································································································· 8 6 钢筋混凝土面板 ·········································································································· 8 6.1 面板预制 ··············································································································· 8 6.1.1 基本要求 ········································································································· 8 6.1.2 实测项目 ········································································································· 8 6.1.3 外观鉴定 ········································································································· 8 6.2 面板安装 ··············································································································· 9 6.2.1 基本要求 ········································································································· 9 6.2.2 实测项目 ········································································································· 9 6.2.3 外观鉴定 ········································································································· 9
I
DB ××/T ×××—20××
7 新旧路基拼接段 ·········································································································· 9 7.1 后浇段(水泥混凝土) ····························································································· 9 7.1.1 基本要求 ········································································································· 9 7.1.2 实测项目 ········································································································· 9 7.1.3 外观鉴定 ······································································································· 10 7.2 透水混凝土垫层 ···································································································· 10 7.2.1 基本要求 ······································································································· 10 7.2.2 实测项目 ······································································································· 10 7.2.3 外观鉴定 ······································································································· 10 8 伸缩缝(无缝式) ····································································································· 10
8.1.1 基本要求 ······································································································· 10 8.1.2 实测项目 ······································································································· 10 8.1.3 外观鉴定 ······································································································· 10 9 护栏 ························································································································ 11 9.1 护栏底座 ············································································································· 11 9.1.1 基本要求 ······································································································· 11 9.1.2 实测项目 ······································································································· 11 9.1.3 外观鉴定 ······································································································· 11 9.2 钢护栏 ················································································································ 11 9.2.1 基本要求 ······································································································· 11 9.2.2 实测项目 ······································································································· 11 9.2.3 外观鉴定 ······································································································· 12 附录 A:单位、分部及分项工程的划分 ·············································································· 13 附表 A.1单位、分部及分项工程的划分 ··········································································· 13 附表 A.2单位、分部、分项工程划分表 ··········································································· 13 附录 B:质量检验评定用表 ····························································································· 14 附表 B.1 分项工程质量检验评定表 ················································································· 14 附表 B.2 分部工程质量检验评定表 ················································································· 15 附表 B.3 单位工程质量检验评定表 ················································································· 16 附录 C:工程竣工资料检查要求 ······················································································· 17 附表 C.1 桩板路基工程竣工资料检查评分表 ····································································· 17 附表 C.2 桩板路基工程竣工资料检查评分表 ····································································· 18
II
DB ××/T ×××—20××
前
言
本标准依据GB/T 1.1-2009给出的规则起草。 本标准提出单位:×× 本标准归口单位:×× 本标准起草单位:××
本标准主要起草人:××。 III
DB ××/T ×××—20××
桩板式路基专项工程质量检验标准
1 范围
本标准规定了公路桩板式路基工程质量检验与评定的术语和定义、基本规定、管桩、钢筋水泥混凝土面板、新旧路基拼接段、伸缩缝、护栏。
本标准适用于公路新建及改建工程板桩式路基的施工及验收工作。 2 规范性引用文件
下列文件对于本文件的应用是必不可少的。凡是注日期的引用和文件,仅所注日期的版本适用于本文件。凡是不注日期的引用文件,其最新版本(包括所有的修改单)适用于本文件。
CCJJ/T 135 透水混凝土施工工艺及技术规范 GB 13476 先张法预应力混凝土管桩
GB 50202 建筑地基基础工程施工质量验收标准 JGJT 406 预应力混凝土管桩技术标准 JTG F10 公路路基施工技术规范 JTG F80 公路工程质量检验评定标准 JTG/T F50 公路桥涵施工技术规范
TB 10751 高速铁路路基工程施工质量验收标准 3 术语和定义
下列术语和定义适用于本文件。 3.1 桩板路基 Pile Board Roadbed
采用桩基及板结构形成支撑路面结构的新型路基形式,相比于土质路基有工后沉降小,整体刚度大的优点,是处理深厚软土、松软土和深厚湿陷性黄土或达到减少占地等目的的有效方法。 3.2 关键项目 Dominant Item
分项工程中对结构安全、耐久性和主要使用功能起决定性作用的检测项目,在本标准中以“△”表示。
3.3 一般项目 General Item
分项工程中除关键项目以外的检查项目。 4 基本规定 4.1 一般规定
4.1.1 公路桩板路基工程质量检验评定应按分项工程、分部工程、单位工程逐级进行。
1