K1+478~K1+568段左侧片石混凝土挡土墙
变电站通信系统施工方案
xxx有限公司
2016.10.1
1页脚内容
K1+478~K1+568段左侧片石混凝土挡土墙
目录
1.编制依据·······························································01 2.工程概况·······························································02 3.施工所需设备管理及工器具··········································03 4.施工工期及人员配置··················································05 5.主要施工程序及方法··················································06 6.质量控制措施及施工工艺标准·······································10 7.安全施工及保证措施··················································14 8.安全文明施工及环境保护措施·······································17
2页脚内容
K1+478~K1+568段左侧片石混凝土挡土墙
1.编制依据
1.1 500千伏变电站通信安装图纸.
1.2设备厂家说明书及技术资料
1.3《电气装置安装工程电缆线路施工及验收规范》-GB50168-2006 1.4《电气装置安装工程盘、柜及二次回路接线施工及验收规范》-GB 50171-2012
1.5《电气装置安装工程蓄电池施工及验收规范》GB50172-2012 1.6《电气装置安装工程质量检验及评定规程》DL/T5161.1 5161.17-200
1.7项目部同类设备安装经验、施工管理文件、资料及工程技术总结。