Technical Agreement

Dated : Person Attended :

Subject :

Hull No.:

Maker :

2007/12/12

Guangzhou Hangtong Shipyard

A.P.C. Shanghai Rep. Office Mr. He Liangxing

MarineLine Coating Material for 1x9000 Chemical tanker at Guangzhou Hangtong Shipyard

Advanced Polymer Coatings Ltd/U S A

THE TECHNICAL SPECIFICATIONS AND SCOPE OF SUPPLY OF THE

ABOVE- MENTIONED SUBJECT HAVE BEEN DISCUSSED AND REACH TO AN AGREEMENT AS PER ATTECHED PAGES.

Guangzhou Hangtong Shipyard

Name: _________

Dated: _________

A.P.C. Shanghai Name:__________ Dated:________

Specification and Scope of supply as each ship set: 每船套的供货范围和说明:

A. 5800 liters MarineLine coating material covering abt9,000 m2 of surface area in 12 cargo

tanks.(10 cargo oil tanks and 2 slop tanks)

提供5800升MarineLine特涂油漆,满足12个货油舱总面积9,000平方米。 (10货油舱,2个污油水舱)

300 liters thinner (toluene or xylene) shall be provided by shipyard and confirmed by APC. 300 升稀释剂(甲苯或二甲苯)由船厂提供,并经APC认可后方可使用。

B. Inspection and testing as followings (Technical service 50days on site. APC representative will

arrive at shipyard 7 days ahead of main grit blasting of these tanks. The actual time shall be provided by shipyard.)

服务商现场检查和试验如下:(现场技术服务时间为50天,技术服务人员在此六对舱主喷砂前7天到厂,具体时间由船厂通知。)

? surface contamination test

表面清洁检查

Before coating, the acceptable level of chloride contamination (as NaCI) on steel surface must not exceed 10micrograms/cm2 as CIˉ)

货油舱涂装前钢板表面盐份值不得高于10μg/cm2 (CIˉ离子的含量)。

? DH and temperature test, abrasive blasting, RH at or lower 50%, when spaying, keep RH

at or lower 55% ,steel temperature at least 3C above the dew point of air temperature 湿度和温度检测, 喷沙时,相对湿度在50%或以下,喷涂时控制相对湿度在55%或以下,钢 板温度至少在露点温度3度以上

? Steel surface profile test75~100micron

钢材表面粗糙度检测75~100micron ? Verification of Sa 2.5

喷砂质量检测Sa 2.5

? Dry film thickness test( Average DFT 250~350 micron, 90% of all measurements; Lowest

DFT 200 microns, Max. of all 10% measurements; Max. DFT 600 micron, Max. 0.1% of all measurements) ?

干膜厚度检测( 平均厚度:250~350 micron, 90%的所有测量点;最低的干膜厚度:200 microns,最多不超过所有测量点的10%;最厚的干膜厚度 : 600 micron,最大不超过所有测量点的0.1%)

? 100% pinhole testing at 3000 volts

3000伏100%针孔检测

Pinhole testing at 1500 volts for repaired areas. 修补区的针孔测试采用1500伏电压。

? Solvent wipe test

溶剂擦拭试验

Shipyard performs according to APC procedure, APC will approve and sign for acceptance. If solvent wipe test fails, APC will shoulder all responsibilities including man-hour, material and time limit of delivery etc.

船厂按照APC涂装程序施工,并经APC现场技术服务签字、认可。若溶剂擦拭试验出现任何问题,由APC负全责(包括工时、材料和工期等)。

APC will supply all inspection equipments (humidity gauge, temperature gauge, thickness gauge, holiday detectors, etc.) and operate them on site. APC将提供所有检测用设备并进行现场操作。

C. APC will supply heat curing equipment as below: (Heat curing 8 continuous day on site), heat

curing temperature to be 82C~100C, for 6 hours.

APC将提供热固化设备如下:(热固化连续7天), 固化温度82到100度,至少保持6小时。 ? High velocity burner

高速燃烧器

? Combustion air fans

燃烧空气风扇

? Burner flame failure panels

燃烧器火焰故障检测板 ? Chart recorders

特性记录仪

? One lot parts: hoses, cables, regulators, plugs, wires, camlocks, recording paper, clips

and looms

一单的其他组件:软管,相关电缆,调节器,插头,接线,凸轮锁,记录纸,夹子,绕线机 ****Only item required from shipyard is KaiTeng gas (main component is C3H8, the pressure is 0.2-0.3MPa) and 2 or 4 each 200 mm diameter ducts for insulation in tanks from bottom. 船厂将提供剀腾气(主要成分为丙烷C3H8,压力为0.2-0.3MPa)和两根或4根200毫米口径可达舱底的风管。

****As the gas for the burner is use KaiTeng gas, and yard has no experience for such curing procedure, therefore, APC should take the responsibility if any accidents caused by their personnel in the use of the gas subject to the yard will fully follow the instruction by APC Adviser. 由于燃烧器使用的燃气为剀腾气,船厂没有热固化经验,所以在船厂工作人员严格按APC提供的操作规程执行的条件下,因使用燃气而导致的突发事故将由APC负责。

****Heat cure shall be done entirely by APC. APC负责完成热固化的全部工作。

****Heat cure shall be done before sea trial 热固化应在试航之前完成

D. During sea trial, tanks need to do salt water testing, the tanks are to be completely filled with clean sea-water so that there is no ullage. The sea-water shall remain in the tanks for a minimum period of no less than 24 hours counted from the time no ullage remained. The

maximum period of immersion shall not exceed 72 hours, unless otherwise agreed by owner. 试航时,所涂的舱需要做海水浸泡试验时,舱内必须充满海水,从海水充满之时起,至少浸泡24小时。除非经船东认可,浸泡时间不超过72小时。

E. APC will take responsibility for yard’s relative loss caused by the quality of APC MarineLine

coating material.

APC将为因MarineLine油漆质量问题而给船厂造成的损失承担相应责任。

E

Shipyard and the coating applying company to supply: 船厂和特涂施工公司提供的服务:

1. Staging until spray application is completed.

搭脚手架直到喷涂施工结束

2. Surface preparation to Sa 2.5 per APC’s specification

根据APC要求表面处理至Sa 2.5

3. Dehumidification equipment until complete of spraying

提供除湿设备直到喷涂完工

4. Cleaning works before coating application where required.

在相关地方进行喷涂之前的清洁工作

5. Spray/stripe coating application as per APC’s specification

根据APC的规格进行整体喷涂和接缝补涂施工作业

6. Compressed air as required for the surface preparation and spray application

提供用于表面处理和喷涂作业所需的压缩空气.

7. Gas and electricity for heat curing (gas consumption 0.50kg/m3 of tank volume-380/440V,

100 amps, 3 phase).

提供用于热固化所需的可燃气和电源(可燃气消耗舱容的0.50kg/m3, 电源380/440伏, 100安培, 三相)。

8. Crane service and forklift service for getting equipment and materials onboard ship and for

movement of heat curing equipment during heat cure cycle.

提供吊车和铲车服务, 用于将设备和材料运上船以及热固化循环中设备的移动。

F APC provide the Insurance guarantee 5 years APC 提供五年的质保

G APC provide the technical manual and the relative applying procedure documentation in time. APC 及时提供技术说明书和相关涂装工艺资料。

After business contract signed, the technical agreement will become effective and be a part of the business contract.

本技术协议在商务合同签订后生效,并作为商务合同的一部分。

APPENDIX

Coating System 油漆配套 Area Coat 部位 度数 Coating Name 油漆牌号 DFT Standard 干膜厚度标准 150μm 150μm 300μm 150μm 150μm 300μm Maker 厂商 Wall & ceiling 顶壁 1st coat 第一度 MarineLINE 784 (red) 2nd coat 第二MarineLINE 784 (grey) 度 Total DFT 总干膜厚度 1st coat 第一度 MarineLINE 784 (red) 2nd coat 第二MarineLINE 784 (grey) 度 Total DFT 总干膜厚度 Tank top 舱底

Advanced Polymer Coatings (APC)

Marineline Coating 9000 DWT At Hangtong(9000t(5) 化学品船货油舱涂装技术协议)

TechnicalAgreementDated:PersonAttended:Subject:HullNo.:Maker:
推荐度:
点击下载文档文档为doc格式
4z3rh99neq2i4cx3qin2
领取福利

微信扫码领取福利

微信扫码分享