Forecast consumption/generation

Link to explanations, examples and the selection list for indicated fields, please refer to

document “Use Case Description draft ver0.55” Version of Template: 0.55 - short, Sept 2011

This version only covers elementary field to describe the basic idea of a use case. A complete and a general version are available, see link above.

draft – short version Use Case Name: – 2 – 1 Description of the Use Case Name of Use Case:

Forecast consumption/generation Name Author(s) or Committee: Peter Ferstl

Scope and Objectives of Function:

The Customer EMS (H/B/I automation system) gives a forecast to the DSO to enable to better manage capacity and provide higher quality of service.

Short description (max 3 sentences):

Customers who forecast power usage, hours, days, or perhaps months ahead, can better manage power costs and production schedules. Sharing this forecast information with power suppliers is a win-win and enables electric power providers to better plan and manage capacity and provide higher quality of service.

Complete description:

The Customer EMS (H/B/I automation system) cyclically estimates a rolling forecast of the consumption or the generation. This forecast is transmitted to the DSO. The forecast starts with the present power demand or generation and is continued in (fixed?) time slots (of 15 minutes?) in to the future. The maximum forecast time is 3 Months (?). The forecasted values are not guaranteed, but the likelihood increases as closer it is to the current time. Is there a time limit when the forecast is guaranteed?

The forecast contains real power consumption or generation. It may contain reactive power or effective CO emissions for generated power. 2

1. Historical Interval Energy is provided to the CEMS. There are four variants in this

step depending where the historical data is kept. a. The CEMS had its own history of energy consumption.

b. The CEMS retrieves historical energy consumption from the Energy Supplier.

c. CEMS retrieves historical energy consumption from an Energy Information Provider.

d. CEMS retrieves historical energy consumption from the Energy Services Company.

2. Onsite Generation Capacity and Availability is Determined. The capacity and

availability of any onsite generation equipment is provided to the CEMS by the onsite

equipment.

3. Onsite Electrical Storage Capacity and Availability is Determined. The capacity and

availability of any onsite electrical storage equipment is provided to the CEMS by the

onsite equipment.

4. Onsite Thermal Storage Capacity and Availability is Determined. The capacity and

availability of any onsite thermal storage equipment is provided to the CEMS by the

onsite equipment.

5. Weather Prediction Information is Determined. The predicted weather for the interval

being estimated is provided to the CEMS by Weather Service either directly, or via the

Energy Information Provider.

6. Historical Production Data is Determined. The historical production schedule that

correlates to the Historical Interval Energy is provided by the CEMS. 7. Initial Production Scheduling Information is Determined. The CEMS determines

production scheduling information for the interval being estimated. draft – short version

Use Case Name: – 3 –

8. Production Schedule Energy Usage, and Energy Demand Forecast are Created.

The CEMS uses the Preliminary Interval Energy Usage, Energy Demand, and Energy

Pricing Information to create the Production Schedule and Energy Demand Forecast.

The Energy Demand Forecast is sent to the DSO and / or the energy provider.

Actor Names:

DSO, Customer Energy Management System 2 Drawing or Diagram of Use Case draft – short version

USE CASE NAME

USECASENAMEUSECASENAME:Forecastconsumption/generationLinktoexplanations,examplesandtheselectionlistforindicatedfields,pleaserefertodocum
推荐度:
点击下载文档文档为doc格式
4dk0j96qda5nrap1rg1l036aw5tvxo00xrx
领取福利

微信扫码领取福利

微信扫码分享