浅谈高速公路隧道机电设备的安装调试
摘要:隧道机电工程具有子系统多、系统复杂、涉及领域广、技术含量高、专业性强的特点。隧道机电工程的安装与调试阶段是施工管理的关键阶段;具有工程量大、安装强度高、内容复杂、质量标准要求高等特点。安装与调试中对一些细节问题不重视,会留下隐患,造成设备运转不正常,甚至导致损坏。强化过程控制,减少质量通病,可使隧道机电系统设备运营可靠、安全、节能。 关键字:高速公路;隧道;机电设备;安装调试
abstract: the mechanical and electrical engineering with subsystem tunnel more complex, involve field, system wide, with high technical content, professional and strong characteristics. tunnel electrical and mechanical engineering installation and commissioning stage is the construction management of the key stage; with big, installation quantity of high strength, content complex, quality standards higher characteristic. in the installation and commissioning of some detail not value, will stay hidden trouble, cause equipment doesn’t operate properly, and even cause damage. strengthen the process control, reduce the quality problems, can make the tunnel operation
electromechanical system reliability, safety, energy saving. keyword: highways;tunnel; mechanical and electrical