7, Building structural parts

Building structural, piping support; Help Haiyi company complete the base of structure design.

The design include the whole area of the power station in this project, fire control, heating ventilation, lighting, communication. The designer supply the all of the equipment list, material list, installation diagram, construction drawing an so on. 第五条 发包人与设计人相互提交的有关资料、文件及时间:

Article 5. Relevant materials, documents and time submitted to the designer by the employer.

第1阶段:概念设计

1、 合同签订时,发包人即提供天然气元素分析资料、海水水质资料,电站当地气象资料和当地震烈度资料;燃气轮发电机组及余热锅炉资料。 2、合同生效和收到上述有效资料后45天内设计人提供概念设计文件: 1)初步概念GA图(PDF格式)

2)3D渲染的图像(五个视图,PDF格式) 3)3D动画解说(长达一分钟) 4)概述功能规格说明书

5)粗略订购成本,建立和组件预算细目 第2阶段:修改概念设计的内容

初步概念设计审查后, 修改概念设计的内容提给NAMCO。需要调整和修正内容需经有关部门审定。

第3阶段:完成驳船及驳船电厂的基本设计 成果:

5

规范 2)GA图 3)救生设备计划 4)消防控制计划 5)结构防火保护计划 6)安排的导航灯 7)容量规划 8)中端船舶部分 9)简介甲板计划 10)外壳制造 11)典型的横剖面 12)横向和纵向舱壁 13)前最终结构 14)尾部结构

15)装载坡道或其他安排 16)燃油系统图 17)舱底水系统图 18)压舱系统图 19)淡水系统图 20)电气系统单线图 21)电力负荷平衡 22)微调和稳定性 23)空塔空间计算 24)吨位计算

第4阶段:招标船厂合作协调的补充基础+安装 Stage 1:The concept design

1. When the contract signed, the employer must supply the analysis data of natural gas, water quality data of sea water, local weather data of power plant, local

6

earthquake data, MS9001E gas turbine generating unit data and HRSG data. 2. After contract become effective and receive the availability data above in 45 days, the designer supply the concept design. Draught concept GA drawing (PDF format) 3D rendered images (up to five views –PDF format) 3D walkthrough / fly around (up to one minute) Outline functional specification

Rough order of magnitude cost to build and component budget breakdown Stage 2:

Any amendments needed to the concept can take place after the initial presentation to NAMCO . there will need to be some tweaks and revisions following the statutory authorities and reaction I am sure. Amendments to concept.

Stage 3: Basic design of barge power vessel (this stage shall be completed with HaiYi company) Deliverables: specification GA drawing

Life saving appliance plan Fire control plan

Structural fire protection plan Arrangement of navigation lights

7

Capacity plan Mid ship section Profile & deck plan Shell fabrication

Typical transverse sections Transverse &longitudinal bulkheads Fore end structure Aft end structure

Embarkation ramp or other arrangement Fuel system diagram Bilge system diagram Ballast system diagram Fresh water system diagram Electrical single line diagram Electrical load balance Trim & stability Freeboard calculation Tonnage calculation Stage 4

8

Supplementary fee for tendering to shipyards and co coordination builds and installation.

第六条 设计人向发包人交付的设计文件、份数、地点及时间: 方案设计文件: 份(中英文) (PDF版) 交图地点: 南京 交图时间: 按第五条规定

Article 6 Documents, number of copies, location and time submitted to the employer by the designer:

Design documents: 8 copies (in Chinese and English ) Submission Location: Najing

Submission Time: Accoding to Article 5 第七条 费用

双方商定,本协议的设计费为: 万元(含审图费)。 Article 7.Expenditure

It is agreed between both parties that the design fee under this contract is RMB(include checking drawing fee) 第八条 支付方式

第1阶段:概念设计完成后,支付预算费用: 万元。

第2阶段:初步概念设计审查通过后,支付预算费用: 万元。。 第3阶段:完成驳船及驳船电厂的基本设计:支付预算费用: 万元 第4阶段:: 完成招标船厂合作协调的补充基础+安装:支付预算费用: ,

9

设计技术协议