本英文版为内部资料,仅供参考,以中文版为准。 The Chinese version of standards has precedence to their English translations which are only for internal reference. UDC
GB
中华人民共和国国家标准
National Standard of the People’s Republic of China P GB 50168-92
电气装置安装工程 电缆线路施工及验收规范 Code for construction and acceptance of cable levels electric equipment installation engineering
Issued date:12-16-1992
Execution date:07-01-1993
Issued Jointly by
State Bureau of Technology Supervision Ministry of Construction,PRC
中华人民共和国国家标准 National Standard of the People’s Republic of China
电气装置安装工程 电缆线路施工及验收规范 Code for construction and acceptance of cable levels electric equipment installation engineering
GB 50168-92
Mainly Preparation by: Ministry of Energy Source of the People’s
Republic of China
Approved by:
Ministry of Construction of the People’s Republic of China
Execution Date:
07-01-1993
— 1 —
Notice on the Issuance of the National standard
《Code for construction and acceptance of the rotating motor
in electric equipment installation engineering》
JB No. 911 [ 1992 ]
According to the requirements of the document of JBH No. 78 (1987) issued by the National Planning Committee and the document of JBZ No. 25 (88), the 5 standards such as 《Code for construction and acceptance of the reeling motor in electric equipment installation engineering》set down by the Energy Source Ministry associated with other departments concerned have been jointly checked up by the concerning authorities. Now the following codes are approved to be applied as compellent national standards: 《Code for construction and acceptance of the reeling motor in electric equipment installation engineering》GB 50170 – 92,《Code for construction and acceptance of the wiring of panel , cabinet and secondary circuit in electric equipment installation engineering》GB 50171 – 92, 《Code for construction and acceptance of the storage battery in electric equipment installation engineering》GB 50172 – 92, 《Code for construction and acceptance of the cable lines in electric equipment installation engineering》GB 50168 – 92, 《Code for construction and acceptance of the grounding device in electric equipment installation engineering》GB 50169 – 92. These standards shall be executed from July, 1st 1993 and chapter 3 (reeling motor), chapter 4 (wiring of panel, cabinet and secondary circuit), chapter 5 (storage battery), chapter 11 (cable lines) and chapter 15 (grounding device) in the original《Code of construction and acceptance of electric equipment installation engineering》shall be abolished simultaneously.
The Ministry of Energy Source shall take charge of the management of this code, the affairs of specific explanation, etc., shall be charged by the Electric Power Construction Research Institute under the Ministry of Energy Source and the organization of its publishing shall be charged by the Standard Ration Research Institute of the Construction Ministry.
Ministry of Construction of the People’s Republic of China
December, 16th, 1992